EN 10305-1 42CRMO4 Steel Pipe For Gas Cylinder
video

EN 10305-1 42CRMO4 Steel Pipe For Gas Cylinder

EN 10305-1 42CRMO4 steel pipe for gas cylinder alloy steel is a common chromium-molybdenum steel suitable for manufacturing high pressure applications requiring higher strength.
Send Inquiry
Chat Now
Product Introduction

GNEE is an experienced high temperature and pressure steel pipe supplier that can provide you with all grades and size ranges of EN 10305-1 42CRMO4 Precision Seamless Steel Tubes.
EN 10305-1 42CRMO4 Seamless round tube is made of chrome-molybdenum alloy steel, a high-strength steel with excellent mechanical properties. EN 10305-1 42CRMO4 Alloy steel tube has better properties than 34CrMo4 steel due to the higher carbon and chromium content. 42CrMo4 alloy steel has higher strength and hardenability.
EN 10305-1 42CRMO4 Alloy structural steel tube is mainly used to manufacture seamless hydraulic cylinders or gas cylinders and heavy machinery, etc.

Take ActionContact Us: sales@gneetube.com
 

Chemical composition of EN 10305-1 42CrMo4 Precision seamless tube

Chemical Composition  
Carbon (C) 0.38 - 0.45%
Silicon (Si) max. 0.40%
Manganese (Mn) 0.60 - 0.90%
Phosphorus (P) max. 0.035%
Sulphur (S) max. 0.035%
Chromium (Cr) 0.90 - 1.20%
Molybdenum (Mo) 0.15 - 0.30%

Mechanical properties of EN 10305-1 42CrMo4 Cold Rolled Seamless Steel Tube

Mechanical Properties  
Tensile Strength (σb) ≥1080 MPa (1100 N/mm²)
Yield Strength (σs) ≥930 MPa (950 N/mm²)
Elongation (A) ≥12%
Reduction of Area (Z) ≥45%
Impact Energy (Akv) 63 J
Impact Toughness (kv) 78 J/cm² (8)
Hardness 217 HB

EN 10305-1 42CRMO4 Seamless hydraulic tube

EN 10305-1 42CRMO4 Cold drawn seamless tube

Why choose us

Gnee has 14 steel production lines, 10 processing equipment for processing, bending, painting, heat treatment, cutting, drilling, beveling, tempering, surface treatment, complete testing equipment and strong technical force. The annual production capacity is more than 60,000 tons.

Gnee Factory environment

EN 10305-1 42CRMO4 Steel Pipe For Gas Cylinder

FAQ

Q1:How about thequality?
A:Third party inspections are always welcomed. Like BV, SGS etc.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also
according to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.

Hot Tags: en 10305-1 42crmo4 steel pipe for gas cylinder, China en 10305-1 42crmo4 steel pipe for gas cylinder manufacturers, suppliers, factory, Alloy 20 Pipe

Send Inquiry

whatsapp

Phone

E-mail

Inquiry