A671 CC65 CL22 EFW Pipe
video

A671 CC65 CL22 EFW Pipe

A671 CC65 Piping Specification covers electric fusion welded steel pipe with added filler metal, made from pressure vessel quality steel plate.
Send Inquiry
Chat Now
Product Introduction

GNEE's ASTM A671 CC65 Carbon Steel EFW Pipe is produced using a variety of manufacturing processes, including hot working or cold working, and then the pipe is subjected to various tests such as flattening test, hydrostatic test or non-destructive electrical test to ensure that the specified requirements are met.
The A671 CC65 welded pipe specification covers electric fusion welded steel pipe with added filler metal, made from pressure vessel quality plate, for high pressure service at atmospheric and lower temperatures. The A671 CC65 grade pipes are of killed, plain carbon with fine grain structure.
The A671 CC65 electric welded pipe uses the skin effect and proximity effect of high frequency current, so that the current concentrated on the edge of the pipe blank heats the joint surface to the welding temperature, and then is extruded and rolled into a welded pipe.

Take ActionContact Us: sales@gneetube.com
 

Chemical Composition of A671 CC65 Pipes

Specification Steel grade Chemical composition Remarks
C Si Mn P S Ti
Pipes for pressure service
ASTM A671
CC65 0.24 0.13
~0.45
0.79
~1.30
0.035 0.035 - A671/
A672

Mechanical Properties of A671 CC65 Pipe

Products Steel Grade BASE METAL MECHANICAL COMPOSITION Welding point tensile strength (N/mm2) Remarks
Yield point (N/mm2) Tensile Stregth (N/mm2) Test Pieces Elongation (%)
Pipes for pressure service ASTM A671 CC65 240 450~585 - 23 450~585 A671/ A672

ASTM A671 Welded Pipe

ASTM A671 CC65 CL22 EFW Pipes

Our advantage

Gnee has 14 steel production lines, 10 processing equipment for processing, bending, painting, heat treatment, cutting, drilling, beveling, tempering, surface treatment, complete testing equipment and strong technical force. The annual production capacity is more than 60,000 tons.

Gnee Factory environment

 Gnee Factory environment

 

FAQ

1.Q. How can we trust your company?
A.We specialize in the steel business for many years, quality assurance is our prerequisite, you are welcome to visit us by all means.

2.Q. Can you provide samples?
A.Yes, free samples are available for regular sizes, but buyers need to pay the shipping cost.

3.Q.What is the delivery time?
A. About 15-35 days after we confirm your request.

Hot Tags: a671 cc65 cl22 efw pipe, China a671 cc65 cl22 efw pipe manufacturers, suppliers, factory, Galvanized Carbon Steel Pipe, Alloy 20 Pipe, ASTM A333 Low Temperature Steel Pipes, Coated Steel Pipe, Military Pipe, OCTG

Send Inquiry

whatsapp

Phone

E-mail

Inquiry