Oct 27, 2025 Leave a message

ASTM A234,A420,A403,A860 Tee

ASTM A234,A420,A403,A860 Tee Fittings‌ are connectors used at branch points in pipeline systems, featuring three ports (one inlet with two outlets or two inlets with one outlet). They are classified by diameter into ‌equal tees‌ (same size) and ‌reducing tees‌ (different sizes), and by branch morphology into ‌T-shaped tees‌ (straight tee) and ‌Y-shaped tees‌ (lateral tee).

Materials include stainless steel, carbon steel, copper, plastic, and over ten other options, catering to industries such as chemical, construction, oil, gas, and marine engineering. Connection methods encompass ‌butt-weld‌, ‌socket-weld‌, and ‌threaded‌ types, complying with standards like GB, ASME, and DIN.

 

Specification

Products Tee
Size Seamless(SMLS) Elbows : 1/2"-24" ,DN15-DN600 Butt Welded Elbows (seam) :26"-150",DN650-DN3800
Manufacturing process: Hot forming, Cold forming
Type Equal,Reducer
Thickness SCH10,SCH20,SCH30,STD SCH40, SCH60, XS, SCH80., SCH100, SCH120, SCH140, SCH160, XXS
Standard ASME/ANSI B16.9/B16.28; MSS SP 75,MSS SP 43; GOST17378-2001/17376-2001/17375-2001; JIS B2311/B2313/B2316; DIN2605/DIN2606; BS1740.1,BS1965 ,BS1640,BS3799
Material ASTM Carbon steel:ASTM A234WPB, A420-WPL3, A420-WPL6, ASTM A860 WPHY42,52,56,60,70
Stainless steel:ASTM A403 WP304/WP304L/WP316/WP316L/WP321/WP317/WP347,Etc.
Alloy Steel:ASTM/ASME A234 WP 1-WP 12-WP 11-WP 22-WP 5-WP 91-WP 911
GB 10#,20#,20G,23g,20R,Q235,16Mn, 16MnR,1Cr5Mo, 12CrMo, 12CrMoG, 12Cr1Mo
Surface anti rust black painted, anti rust oil, galvanizing
Packing 1)Seaworthy wooden box for fittings with size from 1/2"~14" 2)Seaworthy wooden pallet for fittings with size above 14" 3)According to the packing requirement of clients
Usage Petroleum, chemical, machinery, boiler,electric power, shipbuilding, papermaking, construction, etc
Certification API CE and ISO 9001:2015
Third part inspect BV, SGS, LOIYD, TUV, and other party alloyed by clients
special design as your drawing
Mill Test Certificate EN 10204/3.1B,EN 10204/3.2B
Payment Term: T/T OR L/C
Delivery time: At the earliest, within the period required by customer

 

Manufacturing Process of Tee Fittings

  • Raw Material Preparation‌:

Select suitable pipe materials or steel billets based on the required material of the fittings, ensuring raw material quality meets standards.

  • Heating Treatment‌:

Heat the raw materials to an appropriate temperature to achieve good plasticity for subsequent processing.

  • Forming Process‌:

Use equipment such as hydraulic presses to shape the heated material into a tee via molds, controlling pressure and speed to ensure forming quality.

  • Trimming & Machining‌:

Trim the preliminary-formed tee, remove excess material, and machine the inner/outer walls to ensure dimensional accuracy and surface smoothness.

  • Heat Treatment‌:

Apply processes like quenching and tempering to improve the microstructure, enhancing strength and toughness.

  • Quality Inspection‌:

Perform visual, dimensional, and non-destructive testing (e.g., ultrasonic or magnetic particle inspection) to ensure compliance with standards.

  • Surface Treatment‌:

Apply treatments such as galvanizing or painting as needed to enhance corrosion resistance.

  • Packaging & Storage‌:

After passing inspection, package the tee fittings and store them for dispatch.

 

 
GNEE Tee for sale
 
ASTM A105 Tee
36-inch-equal-tee-astm-a234-wpb-ansi-b16-9-sch-std
SCH 80 Reducing Tee

Contact now

 

Send Inquiry

whatsapp

Phone

E-mail

Inquiry