Mar 12, 2024 Leave a message

Is Welded Steel Pipe Hot Rolled or Cold Rolled? Forming Routes Explained

Why Welded Pipe Is Described as Hot Rolled or Cold Rolled

Welded steel pipe is produced by forming flat product - strip or plate - into a tubular shape and joining the two edges with a weld. The main industrial routes are electric resistance welding (ERW), high frequency welding (HFW), submerged arc welding (SAW, in both longitudinal and helical form), and continuous butt welding for small sizes. Once the seam is closed the pipe wall is not passed through a rolling mill again, so a rolling condition cannot describe the pipe body in the way it describes a coil or a sheet.

The phrase therefore refers to two separate things: the type of strip used as feedstock, which may be hot rolled or cold rolled, and any cold finishing operation such as cold drawing or cold sizing applied to the welded pipe afterwards. Both choices change dimensional accuracy, surface quality, strength level and cost, and both belong in the purchase specification.

Hot Rolling and Cold Rolling of the Strip

Hot rolling takes place above the recrystallisation temperature of the steel; carbon steel strip is normally finished well above 850 °C. At that temperature the material is soft and highly deformable, so heavy reductions can be taken in one pass and the coil is comparatively economical. The surface carries a thin oxide scale, thickness tolerance is relatively wide, and the structure is fully recrystallised with good elongation and toughness.

Cold rolling is carried out below the recrystallisation temperature, usually at room temperature, on strip that has first been descaled by pickling. Cold reduction gives a bright, smooth surface and a close, uniform thickness tolerance, but the deformation work hardens the steel: strength and hardness rise while elongation and toughness fall. Cold rolled strip is therefore normally annealed or skin passed before it is welded.

Item Hot rolled strip Cold rolled strip
Forming temperature Above recrystallisation temperature Room temperature
Surface condition Oxide scale, rougher finish Bright, smooth finish
Thickness tolerance Wider Tighter and more uniform
Strength and hardness Lower Higher through work hardening
Elongation and toughness Better Lower until annealed
Relative cost Lower Higher

Which Route Suits Which Product

Hot rolled coil is the feedstock for the great majority of welded pipe: ERW and HFW water pipe, structural tube to EN 10219 or ASTM A500, API 5L line pipe, and large diameter LSAW or HSAW transmission pipe. The reason is economic - wall thickness above roughly 3 mm and coils in the tonnes range are only practical from hot rolled material, and the surface scale is removed by pickling, shot blasting or acid cleaning as part of normal processing.

Cold rolled strip is selected where the finished product needs a precise wall, a smooth outside diameter or a fine surface: precision tube, automotive and motorcycle tube, furniture tube, hydraulic and pneumatic tube, and thin wall heat exchanger tube. Cold drawn welded pipe takes the logic one step further - the pipe is welded first, then drawn through a die over a plug, which reduces diameter and wall, improves concentricity and surface finish, raises strength and hardness, and is followed by annealing when a soft temper is required.

Points to Watch When Specifying

State the welding process as well as the strip condition, because ERW, HFW and SAW produce different weld and heat affected zone structures.

Say whether the pipe is delivered as welded, normalized, or quenched and tempered. Normalizing the whole body restores a uniform structure and is common for line pipe in critical service.

Fix the inspection regime: chemical analysis, tensile test, flattening test, bend test, hydrostatic test, and ultrasonic or eddy current testing of the seam.

Remember that cold worked material cannot be repaired by straightening alone; strength gained by cold drawing is lost if the pipe is subsequently annealed.

Check that the strip tolerances needed for the finished wall are actually achievable from the welded pipe process routes available.

FAQ

Q: Is a welded pipe hot rolled or cold rolled?
The pipe body is neither. Welded pipe is formed from strip that may be hot rolled or cold rolled, and the finished pipe may then be cold sized or cold drawn. The properties of the product come from the strip condition plus the effect of welding and any post-weld heat treatment.

Q: Can ERW pipe be made from cold rolled strip?
Yes. ERW and HFW mills run cold rolled, pickled and annealed strip for thin wall precision tube, where bright surface and tight wall tolerance matter more than the lowest possible cost.

Q: Does cold rolling make welded pipe stronger?
Up to a point. Work hardening raises yield and tensile strength but reduces elongation, so if the finished pipe must meet a minimum elongation the strip is annealed before welding, or the pipe is normalized after welding.

Q: What is the difference between cold rolled and cold drawn welded pipe?
Cold rolled describes the input strip. Cold drawn describes the finished pipe, which is welded and then drawn through a die to reduce diameter and wall, improving concentricity and finish and raising strength.

Q: Why is the welded seam often the first area to corrode?
Welding changes the local composition and microstructure and leaves residual stress, so the weld metal and heat affected zone can become anodic to the parent strip. In-line seam normalizing, full body normalizing, and a correct coating system reduce the risk.

Q: Which standards cover welded steel pipe?
API 5L and ISO 3183 for line pipe, ASTM A53 and ASTM A135 for general service, ASTM A500 and EN 10219 for structural tube, EN 10217 for pressure service, and GB/T 3091 and JIS G3444 for water and structural pipe.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry